The LADWP Trap: Your Building Can Be Finished And Still Have No Power

Pacific Palisades is showing a bigger LA problem. I can finish a building and still wait months for LADWP power while interest, taxes, insurance and lost rent keep adding up.

3 min read

The LADWP Trap: Your Building Can Be Finished And Still Have No Power
Photo: ChatGPT illustration

Pacific Palisades is rebuilding fast.

But if you're buying lots and building homes to sell, watch for another holdup: power.

You can finish the house and still wait months for LADWP. That means more interest, insurance, taxes and lost time before you can sell or collect rent.

1,000+ homes are already under construction

As of August 5:

1,750 rebuild applications.

1,196 permits issued.

1,006 homes under construction.

Only 30 certificates of occupancy.

At the same time, LADWP is rebuilding the neighborhood's power system. It has already put in 1,825 poles and 334,540 feet of wire. The permanent system will include a new main power line along Sunset Boulevard. It will also grow a key power station to 90 megawatts.

More than 1,000 houses are going up while the power system that serves them is also being rebuilt.

That's the risk.

Some finished projects are already waiting

One Palisades homeowner told Spectrum News that he asked for his power hookup in August 2025. More than a year later, he said he was still waiting. His house was finished.

Real estate owner Syd Leibovitch told the Palisadian-Post that his new Rodeo Realty building sat for about three months waiting for permanent power.

I've dealt with this myself. I've waited four to six months for LADWP on one of my own projects. I called all the time trying to get the work scheduled.

Our electrical work wasn't the problem. Getting LADWP crews to the property was.

Don't wait until the end

This is where investors get caught.

LADWP needs to approve things like the meter location, trench, conduit and underground service. LADWP itself says underground projects can take 6 to 8 weeks just for an engineer to figure out the install cost. I think it can be many months if you're not pushing hard on it.

And that's before you even get power.

So don't treat power as something your electrician handles at the end.

Before buying a palisades lot or land to build

I'd get answers to five questions:

1. Where is my permanent power coming from? Find the actual pole, transformer, vault or underground system.

2. How much power will the new house need? Big homes, EV chargers, pools and multiple HVAC systems can change the load.

3. Has LADWP approved the meter location and service plan?

4. Does LADWP need to upgrade anything outside my property? This is the big one. Your electrician can be finished while LADWP isn't.

5. What happens to my return if power is 90 to 365 days late? Add months of interest, taxes, insurance and overhead to your numbers.

LA needs more crews

LADWP told Spectrum it has added six Electric Service Representatives to the Palisades and is training more. But with 1,000+ houses already under construction, I think Los Angeles needs to think bigger.

If LADWP doesn't have enough people, they need to hire more. They should also look at letting qualified private contractors do the right kind of work under LADWP standards and inspections.

The operator take

Don't build without knowing how hard it can be to get LADWP to power up your building. If you think you'll build and they'll just show up and turn on the power, I can tell you that's not going to happen.

Before buying a Palisades lot or land to build, find out when LADWP can really power the finished property. Then plan for them being up to 6 months late.

A 90 day delay isn't just 90 days. It's three more months of interest, taxes, insurance and overhead with no sale and no rent.

That's real money coming straight out of your return. I know it, and it cost me hundreds of thousands of dollars.

The deal isn't done when construction is done. It's almost done when DWP powers you up so you can start your inspections.

In the City of Los Angeles, power should be part of your numbers before you buy the land.